News
DRESS YOU BUILDING UP WITH THE MATERIALS EQUAL TO YOUR VALUE AND LEVEL
Our Japanese customer (Kyowa Plastics Industrial Co., Ltd) has chosen HRC panels for their building, that is the certain shirt lasting durably along time.
With only 6 on site workers, the construction has been completed for one month including 2400 m2 factory wall, 20m length of fence and some utility houses
Once again, HRC has proven to customers the outstanding construction speed which significantly reduces labor costs in general.
Hereby are the pictures of applying HRC Precast Concrete to factory category at raw stage:
Factory form the after side ( Picture 1)
Factory form the after side ( Picture 2)
Factory Inside ( Picture 1)